
For the FAST Foundation's Big Graduation Day at the Aram Khachaturian Concert Hall in Yerevan, C-Squared engineered interior 3D projection mapping across the venue's stage architecture. The technical installation mapped customized visual sequences onto the hall's interior structural elements, serving as the visual backdrop for speeches, presentations, and diploma awards.
Project Overview
Client Name: FAST Foundation
Project Name: FAST Foundation Big Graduation Day
Date: April 27, 2026
Venue: Aram Khachaturian Concert Hall, Yerevan, Armenia
C-Squared Scope: Interior architectural 3D projection mapping, optical alignment, signal routing, and on-site visual control
The FAST Foundation commissioned C-Squared to design and execute an interior visual setup for their graduation ceremony. The brief required projecting dynamic graphics across the hall's surrounding stage structures and side walls to complement standard stage screens, expanding the visual scale of the presentation without mounting physical hardware directly onto the venue's interior walls.
Achieving multi-surface visual coverage within the Aram Khachaturian Concert Hall required mapping projections across multi-tiered wood paneling, curved balconies, and non-flat architectural features. The primary technical challenge lay in calibrating high-lumen projectors from temporary freestanding positions to eliminate image warping and light spill onto stage presenters and award recipients.
Non-Invasive Structural Alignment: Positioned high-brightness projector arrays on temporary freestanding rigs, using spatial calibration software to warp and fit visuals cleanly to the hall's interior geometric contours without drilling or using physical wall adhesives.
Synchronized Event Graphics: Programmed tailored visual sequences that evolved in coordination with the event agenda - shifting between ambient background textures during speeches and high-contrast motion graphics during award announcements.
On-Site Signal & Visual Management: Managed live video signal routing and playback control from the technical control desk to ensure real-time coordination with stage proceedings.
Delivered continuous interior architectural projection mapping throughout the complete graduation program without alignment drift or signal latency.
Installed, operated, and dismantled all projection equipment on schedule without leaving physical marks or structural alterations within the venue.
Commissioning Client & Organizer: FAST Foundation
Venue: Aram Khachaturian Concert Hall, Yerevan, Armenia
Have a great project like this in mind?
