
In July 2025, Fastex hosted the Harmony MeetUp 7 Afterparty at the iconic Pharaon Complex in Yerevan. Centered around the concept of unlocking "the 7th dimension," the event brought together Web3 leaders, innovators, and industry partners for an evening blending technology, sound, and digital visual art.
To transform the landmark venue into a multi-sensory brand experience, C-Squared was commissioned to engineer large-scale architectural projection mapping across the exterior pyramid structures of the Pharaon Complex, synchronized with live audio-reactive visual generation.
Event Overview
Event: Fastex Harmony MeetUp 7 Afterparty
Date: July 2025
Location: Pharaon Restaurant & Complex, Yerevan, Armenia
Client & Ecosystem: Fastex / Fasttoken
Partnership: C-Squared in partnership with doodooc
Production Scope: Architectural pyramid projection mapping, audio-reactive music visualization, and event technical production
The unique architecture of the Pharaon venue - featuring massive exterior pyramids- offered a high-impact canvas for large-format 3D projection mapping.
3D Facade Calibration: Using high-lumen projector arrays equipped with precision optics, our team mapped high-contrast motion graphics directly onto the angled surfaces of the pyramids.
Brand Integration: Custom visual sequences incorporated Fastex’s AknEye branding and 7th-dimension motifs, weaving brand identity into the physical architecture of the venue.
In partnership with doodooc, C-Squared integrated real-time generative audio visualizations mapped directly onto the pyramid surfaces.
Real-Time Sound Synchronization: Using doodooc's generative music visualization software, audio frequencies from the afterparty DJ sets were translated live into dynamic motion, light pulses, and geometric shifts.
Multi-Sensory Impact: The combination of architectural projection mapping, audio-reactive visuals, and full-range sound design transformed the venue's exterior into a responsive digital installation.
Beyond the architectural mapping, C-Squared provided complete technical production support, managing high-brightness projector infrastructure, audio distribution, signal routing, and on-site engineering execution to ensure seamless performance throughout the night.
Have a great project like this in mind?
